CUGLATON USER MANUAL
colorcoding
Pre-treatment
The surface onto which CUGLATON must be applied needs to be clean. The cement skin coating should be removed and no free water may be present.
Pre-treatment with water
The surface must only be moistened with water (please: no free water!).
Or:
Pre-treatment with CUGLACRETE Hechtprimer cementgebonden or CUGLACRETE Hechtprimer Epoxy Sealer.
For an optimum bond we advise the use of CUGLACRETE Hechtprimer Cementgebonden, a cement polymer modified system, or CUGLACRETE Hechtprimer Epoxy Sealer, an epoxy-based system.
Mixing
Mechanically mix CUGLATON until a homogeneous mixture is formed. Mixing time depends on the type of mixer, mix at least 3 minutes.
Water bandwith: see front of bag. Within the specified water bandwith, dose such a large amount of water that a workability corresponding to the mortar type achieved, withou beelding.
Handling information
Processing time 30 minutes, at 20 °C
Environmental temperature minimum 0 °C, maximum 30 °C
Surface temperature > 0 °C
Follow-up treatment
The finished surface should be carefully protect from dehydration with Cugla Curing Compoun, or covered with plastic film.
Storage
Dry storage